HMYOI FELTHAM

HMYOI Wetherby & HMYOI Feltham

Key Info:
Project Title: HMYOI Wetherby & HMYOI Feltham
Client: Amey PLC
Contractor: PMA (Services) Ltd
Location: Wetherby, West Yorkshire & Feltham, London
Sector: Custodial
Services: HVAC Testing & Commissioning.

Key Contact
Scott Hartley
Managing Director
Scott.hartley@ecs-commissioning.co.uk
01535 600688

Project Summary

ECS are delighted to have be involved in the on going refurbishment of several wings at both Wetherby and Feltham Young Offenders Institutes.

We were engaged by Rocool Ltd in 2021 to oversee the commissioning of several VAV extract systems across the two sites.

Appointing a commissioning specialist early within a project is crucial to allow any potential issues with design and intended plant/equipment to be highlighted and overcome before it is too late or often too costly.

Having a vast knowledge of the various manufacturers on the market and their products allows our engineers to advise and guide the client toward the most suitable product for their scheme. Our experienced engineers have an in-depth, working knowledge of VAV technology, how VAV’s function and
how/where they should be installed to ensure accurate results. Resulting in systems that are 100% commissionable, compliant and that always realise the design intent.

Our professional and flexible engineers are familiar with all the necessary protocols associated with working in such a tightly controlled environment, allowing us to help deliver fully compliant schemes often within a tight programme of works.